Salt water intrusion into the Oscillo Drive Failures of inverters and power control modules
System detaching for the sea bed mounts. The risk frequency of all the above are low

Risk severity is the shutdown of the wave energy converter, which reduces the total output of the energy of the barge by the one device. The loss of one device’s power can easily be managed as the system continues to operate fully (short one WEC) until it is replaced.

There are 2 Power Control Modules capable of handling the entire load, should one fail. We mitigate this risk by increasing maintenance cycles testing electronic sub components.

We have 4 mooring points for redundancy. We can add alarms to message in case one or more cables fail.